Project Management and Execution Archives - C&I Engineering C&I Engineering Tue, 01 Oct 2024 14:52:03 +0000 en-US hourly 1 Stillage Screens and Modular Boiler Installation https://www.cieng.com/projects/stillage-screens-and-modular-boiler-installation/ Tue, 01 Oct 2024 14:51:20 +0000 https://www.cieng.com/?post_type=project&p=3710  C&I performed a front-end study and detail design for this project.  The project required installation of a new water treatment...

The post Stillage Screens and Modular Boiler Installation appeared first on C&I Engineering.

]]>
 C&I performed a front-end study and detail design for this project.  The project required installation of a new water treatment and new boiler building in an operational distillery. Integration of systems must occur during a planned summer distillery outage and coincide with a major plant expansion. 

The stillage from the stills is separated in new screeners and the thick stillage is pumped a considerable distance across a road and railroad track to an Anerobic Digestion facility, designed by others. After processing, the C&I team piped the RNG back to the distillery and blended it with an existing natural gas feed to power the new modular boilers. The team has navigated the challenges of working with multiple vendors, permitting entities, and engineering firms to coordinate the design and installation of this project.

The post Stillage Screens and Modular Boiler Installation appeared first on C&I Engineering.

]]>
Distillery Tank Farm and Processing Unit Design https://www.cieng.com/projects/distillery-tank-farm-and-processing-unit-design/ Tue, 01 Oct 2024 14:42:32 +0000 https://www.cieng.com/?post_type=project&p=3704 The objective of this project was to design high-yield processing units and a tank farm for whiskey production, capable of...

The post Distillery Tank Farm and Processing Unit Design appeared first on C&I Engineering.

]]>
The objective of this project was to design high-yield processing units and a tank farm for whiskey production, capable of handling variable batch volumes ranging from single barrel products to large-scale distilled spirits. The scope included designing flexible systems that allow for the efficient transfer of liquids between the tank farm and various processing tanks, as well as accommodating specific processes such as double-barreled products, chill filtration, and direct access to bottling lines.

The processing and bottling facility will be located in Shelbyville, KY, near the distillery, and will be constructed with phased production expansions in mind to support future growth. The design and layout will be reflected in the process description and P&IDs, ensuring the facility’s ability to meet both current and future production demands.  

The post Distillery Tank Farm and Processing Unit Design appeared first on C&I Engineering.

]]>
Crude Heat Integration Project (CHIP) https://www.cieng.com/projects/crude-heat-integration-project-chip/ Tue, 10 Sep 2024 15:19:24 +0000 https://www.cieng.com/?post_type=project&p=3671 This major crude unit revamp, completed during the Q1 2024 Turnaround, showcased our exceptional process design capabilities. This project, estimated...

The post Crude Heat Integration Project (CHIP) appeared first on C&I Engineering.

]]>
This major crude unit revamp, completed during the Q1 2024 Turnaround, showcased our exceptional process design capabilities. This project, estimated at $50MM TIC, was completed on time, within budget, and to the utmost satisfaction of our client. Our team worked tirelessly to upgrade reduced crude to higher value products, resulting in less frequent fouling of crude exchangers and minimal loss of profit opportunities due to exchanger cleanings. Despite the congested nature of the crude unit, our team was able to retrofit numerous pieces of equipment and accommodate stress analysis requirements, bringing piping layout up to current codes.

We started this project in the Definition phase, and despite not having the benefit of completing early phases, we made sure to conduct multiple onsite visits and walkdowns with the customer and provide onsite PE support. Our in-person attendance at 3D Model and Constructability Reviews ensured that the project was successfully completed and installed. We are proud of our team’s exceptional work and look forward to continuing to provide top-notch services to our clients.

The post Crude Heat Integration Project (CHIP) appeared first on C&I Engineering.

]]>
North Substation https://www.cieng.com/projects/north-substation/ Mon, 09 Sep 2024 19:48:38 +0000 https://www.cieng.com/?post_type=project&p=3658 Our team completed Feasibility through Detailed Design for this expansion of the North Substation at this Midwest Refinery with an...

The post North Substation appeared first on C&I Engineering.

]]>
Our team completed Feasibility through Detailed Design for this expansion of the North Substation at this Midwest Refinery with an estimated TIC of over $30MM. The goal of this project was to increase the reliability and safety of the substation, provide additional feeder circuits, and facilitate installation of a 3rd bus, allowing the refinery to provide alternate power sources from both the North and Southwest Substations to critical units in the refinery. We worked closely with several electrical equipment suppliers as well as a 3rd party provider to coordinate their power feed and tie-in to the refinery feed. Additionally, C&I provided on-site support for portions of the construction and commissioning.

C&I’s efforts spanned over 8 years to complete all phases. Over that time, the team adapted the project scope to address client and vendor changes, all while under close corporate observation with the high price tag.

The post North Substation appeared first on C&I Engineering.

]]>
Tank Replacement Program https://www.cieng.com/projects/tank-replacement-program/ Fri, 28 Jan 2022 19:09:37 +0000 https://www.cieng.com/?post_type=project&p=1361 The goal of this project is to repair and/or replace aging tank assets. The client reached out to C&I due...

The post Tank Replacement Program appeared first on C&I Engineering.

]]>
The goal of this project is to repair and/or replace aging tank assets. The client reached out to C&I due to our expertise and familiarity with the parent company’s specifications and preferences. As an on-going program, we are able to help manage program budget, cash flow, and schedule. Our collaborative nature enables us to coordinate effectively with subcontractors and vendors. Our strong Civil & Structural department is overcoming design challenges of setting extremely large tanks in tight spaces. For example, we installed a new tank, 100,000 barrels, that was nearly double the capacity of the existing tank while keeping and repairing the existing tank for added capacity. We are excited to see this program progress while building a relationship with a new client.

The post Tank Replacement Program appeared first on C&I Engineering.

]]>
Urea Capacity Expansion https://www.cieng.com/projects/potash-urea-expansion/ Fri, 28 Jan 2022 19:07:38 +0000 https://www.cieng.com/?post_type=project&p=1409 This client sought to increase its urea capacity from 1,300 TPD to approximately 1,650 TPD to meet increasing market demand....

The post Urea Capacity Expansion appeared first on C&I Engineering.

]]>
This client sought to increase its urea capacity from 1,300 TPD to approximately 1,650 TPD to meet increasing market demand. This is due primarily to its ability to reduce NOX emissions in diesel engines while achieving a 4% to 7% increase in gas mileage. Because of the economic opportunities realized by increasing production capacity, C&I conducted FEL-1 conceptual phase through Detailed Design, Start-up and Commissioning.

To accurately model the process changes, our team created a benchmark simulation of the entire Urea Unit. Creating a Hysys model was a challenge and had to be rigorously tested. Due to the unique chemistry of the process, the urea and ammonium carbamate components had to be created and regressed binary interaction parameters for multicomponent mixtures had to be developed. Our model was validated against a test run, providing confidence in the simulation of future operation. The process team used creativity to address the need for supplemental compressed CO2 gas feed by using liquid CO2 to support the overall capacity increase.

The existing unit was congested, requiring finesse in siting equipment and routing piping. This is where our expertise in retrofit design combined with the 3D modeling tool and laser scan set us up for a successful project. We were able to involve stakeholders in a constructability review early in the design process to locate several new pieces of equipment in an existing structure.

The post Urea Capacity Expansion appeared first on C&I Engineering.

]]>
69 kV Substation Replacement https://www.cieng.com/projects/69-kv-substation-replacement/ Fri, 28 Jan 2022 17:23:27 +0000 https://www.cieng.com/?post_type=project&p=1389 The goal of this project was to replace antiquated electrical equipment, much of which was over 40 years old. Our...

The post 69 kV Substation Replacement appeared first on C&I Engineering.

]]>
The goal of this project was to replace antiquated electrical equipment, much of which was over 40 years old. Our team developed the scope from the Feasibility phase through Implementation, Start-up and Commissioning of the relay building and substation. C&I’s team drew on expertise from previous projects to assist with substation design, cutover planning and load balancing. We were able to work with the client to adjust project cash flow to coordinate with the turnaround schedule.

Due to geographical constraints, the project combined three substations into one. This resulted in multiple cutovers spread over 5 years to match turnaround outages. To make space for the new substation, several storage areas had to be relocated. After installation, the project finished $3MM under budget with minimal RFIs from construction.

The post 69 kV Substation Replacement appeared first on C&I Engineering.

]]>
Refinery Energy Conservation Audit https://www.cieng.com/projects/refinery-energy-conservation-audit/ Fri, 28 Jan 2022 16:43:56 +0000 https://www.cieng.com/?post_type=project&p=1358 C&I was approached with an opportunity to assist our client and the local utility provider, Puget Sound Energy, to discover...

The post Refinery Energy Conservation Audit appeared first on C&I Engineering.

]]>
C&I was approached with an opportunity to assist our client and the local utility provider, Puget Sound Energy, to discover energy conservation ideas to present for grant funding. Our Process team focused on refinery electrical users to identify inefficiencies and propose control strategy to reduce energy demand. To increase payback over time, operation of compressors and pumps were altered to reduce the amount of recycle through the process, resulting in less energy usage.

Through our ASHRAE level 2 energy audit, the proposed scope reduced kilowatt usage by 1,626 hours per year. Our team’s out-of-the-box approach resulted in significant savings and favorable payback. Taking an in-depth review of the facility, beyond the typical ASHRAE updates, we were able to identify unique applications for reducing electrical energy usage.

“The individuals who work in refineries everyday were impressed with the ideas and thoughts our team created. We were able to identify energy savings where no one else could.”

John Droste, C&I Project Manager

The post Refinery Energy Conservation Audit appeared first on C&I Engineering.

]]>
ASO System Revamp for HF Alky Unit https://www.cieng.com/projects/aso-system-revamp-for-hf-alky-unit/ Fri, 28 Jan 2022 14:58:11 +0000 https://www.cieng.com/?post_type=project&p=1371 Leveraging our previous experience with Acid Soluble Oil (ASO) Washer Systems, our team provided insight on how systems are configured...

The post ASO System Revamp for HF Alky Unit appeared first on C&I Engineering.

]]>
Leveraging our previous experience with Acid Soluble Oil (ASO) Washer Systems, our team provided insight on how systems are configured at similar sites to thoughtfully execute the Feasibility phase of the project. At this facility, the current ASO neutralization and spent KOH handling system in the Hydrofluoric Alkylation (HF Alky) unit is a labor-intensive batch process that has many environmental and safety concerns. The system will be replaced with one that is similar to a ConocoPhillips (now UOP) ASO Washer system used at multiple other refineries. This will reduce the likelihood of environmental releases of HF acid and operator exposure to caustic, ASO and HF acid that are present during the manual process. As an added benefit, the new system will also result in operating cost savings.

The project will design and commission equipment which allows for continuous, closed loop treatment of ASO within the HF Alky unit.  As a cost savings, existing equipment will be repurposed where safety or integrity is not compromised. Drawing upon our experience from other refineries, our process team scaled the technology to match refinery flow rates based on comparison of ASO to Caustic ratios from other existing units. Our support on this project extended beyond creating a cost estimate, we also attended our client’s presentation to management. We not only care about project design, but the entire project process and are here to help our clients in any way we can!

The post ASO System Revamp for HF Alky Unit appeared first on C&I Engineering.

]]>
Primary 13.8kV Feeder to Unit https://www.cieng.com/projects/primary-13-8kv-feeder-to-unit/ Thu, 27 Jan 2022 21:51:30 +0000 https://www.cieng.com/?post_type=project&p=1374 Our team provided engineering design to install 13.8kV feeders as primary supply to the a major refinery unit via load...

The post Primary 13.8kV Feeder to Unit appeared first on C&I Engineering.

]]>
Our team provided engineering design to install 13.8kV feeders as primary supply to the a major refinery unit via load break switches to the unit’s substation transformers. This unit is integral to refinery profitability; therefore, increasing reliability to avoid an unexpected outage was a critical project objective. Reliability was improved by serving the unit’s load from independent 13.8kV feeders and extending the main-tie-main philosophy at each of the downstream distribution voltage levels present in the unit (4.16kV, 2.4kV and 480V), requiring addition of new equipment in the existing electrical building. Cable tray infrastructure was installed to support the new feeders.

The team was challenged to integrate new gear into the already congested operating unit. Our open communication and interactive project management style allowed us to involve maintenance, operations, and construction to balance project objectives and meet stakeholder needs.

The post Primary 13.8kV Feeder to Unit appeared first on C&I Engineering.

]]>